About three weeks ago, I posted an item about some erosion along the front of our property. Today, since the temperatures were in the comfortable range of mid-eighties, I started transporting boulders from the back property and placed them along the edge of the path that the runoff takes when we get our summer gully-washers.

I still have a way to go before I will be done. I have some more one-inch red gravel to place on the bare strip on the right end of the area. I also will be transporting more medium-sized boulders to place in front of the ones I brought down today. I also intend to extend the rock wash at the right end a couple of feet to the confluence with the runoff coming down the road.